I
·
Services
Entries 05
+00.00
Five things we do, and the way we do them.
II
·
Capabilities
Plates 01—05
+03.60
[01]
Architecture
New buildings from first sketch to handover. Houses, cultural buildings and the occasional folly, taken through planning, tender and site with the same team throughout.
Deliverables
Feasibility & site study
Concept design
Planning submission
Tender documentation
Site supervision

[02]
Interior Architecture
The inside of a building deserves the same structural thinking as the outside. Joinery, light, acoustics and material — specified to last decades rather than photograph well once.
Deliverables
Spatial planning
Joinery design
Material & finish schedules
Lighting design
FF&E specification

[03]
Masterplanning
Work at the scale where buildings become streets. We set the rules — grain, height, frontage, planting — then design enough of it to prove the rules hold.
Deliverables
Site & context analysis
Density studies
Design codes
Phasing strategy
Public realm design

[04]
Adaptive Reuse
The greenest building is the one already standing. We survey what is there, decide honestly what is worth keeping, and make the new work legible against the old.
Deliverables
Fabric survey
Structural appraisal
Reuse strategy
Heritage consultation
Retrofit detailing

[05]
Furniture & Objects
Pieces made for specific rooms, usually because nothing suitable existed. A few have outgrown their buildings and gone into production.
Deliverables
Bespoke furniture
Prototyping
Fabricator liaison
Small-batch production

III
·
Process
Stages 05
+07.20
The same five stages, with the same people, on every commission.
[ 01 ]
Survey
We measure the site, the fabric and the brief before anything is drawn. It takes longer than most clients expect.
4–11 weeks
[ 02 ]
Concept
One idea, tested in models and sections until it holds up from every side.
6–10 weeks
[ 03 ]
Planning
Drawings and consultation carried through consent by the people who drew them.
3–6 months
[ 04 ]
Tender
A complete construction package, priced by builders we have worked with before.
8–12 weeks
[ 05 ]
Site
Someone from the studio is on site every week until the last snag is closed.
12–24 months
IV
·
Closing
Plate 06
+10.80